the project. Each
Friday, he meets with Public Works
Director Bruce Inman, and they review
the week's work, and determine what will
be the following week's tasks. We
have been told that we will be receiving
these announcements
weekly. When we receive it, we will
post it same day, so check back
regularly. Thanks to Mr. John
Gavigan of EC Construction for taking
the time to send these out, so that we
can help the City and the Contractor
minimize the disruption in your lives by
keeping you
informed as this major undertaking takes
place over the next few months.
Click on the picture to see an enlarged
rendering of how it will look when
completed. Photos were provided
courtesy of Bruce Inman, Director of
Public Works.
Status Report Sierra Madre Downtown Improvement
Project
As of November 1, 2002 the City of Sierra Madre
Downtown Improvement project was substantially complete. The Contractor
remains on site correcting various minor items of work per directions from
City staff inspectors. This work is to be complete by November 15th.
Due to unforeseen difficulties with their suppliers of
poles and light fixtures, the Edison Company was unable to provide all of
the needed street lights and poles in time to meet the November 1st
completion deadline. In order to have a significant section of the project
area lit by November 1, Edison provided temporary acorn-shaped light
fixtures. These lights are brighter than the permanent fixtures that were
ordered. It is important to note that these lights are temporary only. The
permanent lights will match the existing lights on North Baldwin in style
and wattage.
Edison contractors will return to the project area and
set the remainder of the poles and install the light fixtures as they arrive
from the suppliers. The Edison Company has assured the City that all light
poles and all of the permanent light fixtures will be installed by November
15th. Edison has provided temporary fixtures and overtime installation and
service to the City at no charge, in an effort to complete the project in a
timely manner.
Bruce Inman
Director of Public Works
City of Sierra Madre
Received 10/09/02, posted
10/10/02
City
of Sierra Madre Downtown Improvement
Project
NOTICE OF WORK TO BE DONE, Oct. 14
through Oct. 18
MONDAY
REMOVAL &
REPLACEMENT OF SIDEWALK IN FRONT OF:
-
WASHINGTON
MUTUAL BANK
-
PEPPERTREE GRILL
-
CORFU
-
CAPELLI COURT
-
TAILGATORS
-
GRINDING ASPHALT
&
PATCHING POTHOLES ALL STREETS
-
INSTALLATION OF WHEEL CHAIR
ACCESS RAMPS
-
PLANTING OF STREET TREES
-
EDISON CO. WILL BEGIN THE
INSTALLATION OF FOUNDATIONS FOR NEW SIDEWALK LIGHTING
WEDNESDAY:
ROAD SLURRY ON SIERRA MADRE, KERSTING
& BALDWIN AVE.
ALL ROADS WILL BE CLOSED & DETOURS
WILL BE PUT IN PLACE TO RE-ROUTE TRAFFIC.
STRIPING TO FOLLOW THE ROAD SLURRY.
Q: WHY COMPLETE CLOSURE VERSUS
BLOCKING OFF PORTIONS OF THE STREET AND KEEPING IT OPEN?
A: IF THE ROAD SLURRY IS DONE IN
PHASES IT WILL TAKE
2 DAYS & PARKING WILL BE BLOCKED
ON BOTH SIDES OF THE STREET DURING EACH PHASE. WITH THE COMPLETE CLOSURE OF THE
STREET IT WILL TAKE ONLY 1 DAY.
ROAD SLURRY ON BALDWIN AVE.,
SIERRA MADRE BLVD. & KERSTING CT
.
WEDNESDAY,
OCTOBER 16th
BUSINESS
OWNERS:
BEGINNING AT 6:30 AM WE WILL
BEGIN DETOURING ALL
TRAFFIC
EAST & WEST BOUND ON SIERRA MADRE BL. FOR THE INSTALLATION OF THE ROAD SLURRY.
FOLLOWING THE COMPLETION OF
SIERRA MADRE BL. WE WILL CLOSE BALDWIN AVE. TO NORTH & SOUTH BOUND TRAFFIC FOR
THE INSTALLATION OF THE ROAD SLURRY.
THE
INSTALLATION OF THE ROAD SLURRY WILL TAKE THE ENTIRE DAY, WE CANNOT GIVE A
SPECIFIC TIME THAT THE ROADS WILL BE RE-OPENED, SINCE THE DRYING TIME OF THE
SLURRY DEPENDS UPON THE WEATHER.
PLEASE OBEY ALL ROAD
CLOSURES, NO PARKING & DETOUR SIGNS. THE ROAD SLURRY IS A LIQUEFIED ASPHALT
EMULSION & IF DRIVEN ON WHILE WET IT WILL SPLATTER ON THE PAINT OF YOUR
VEHICLES.
Received 9/30/02, posted
10/1/02
City
of Sierra Madre Downtown Improvement
Project
NOTICE OF WORK TO BE DONE, Sept. 30 - Oct. 4
Type
of Work:
-
Pouring colored
concrete wheel chair ramps on Sierra Madre
-
Removal and replacement of sidewalk on Sierra Madre Blvd. Areas will be
excavated overnight, please be cautious when walking near excavations
-
Installation of conduit for electrical outlets on Sierra Madre Blvd.
-
Installation
of irrigation pipes and soil in planters on
Sierra Madre Blvd.
-
Removal of asphalt pavement for islands
-
Asphalt paving for utility trenches and potholes on Sierra Madre Blvd.
-
Planting of trees in Baldwin Ave. planters
Limits
of Work:
Baldwin Ave. from Sierra Madre Bl.
to Highland
Kersting
Court
Sierra Madre BI. from Baldwin Ave. to Lima
Contractor:
E.C. Construction Co.
Received 8/23/02, posted
8/25/02 (I was out of town when it came
in)
City
of Sierra Madre Downtown Improvement
Project
NOTICE OF WORK TO BE DONE, Aug. 26 - 30
Date
of Work per this Notice:
Estimated
Duration:
5 working days
Type
of Work:
-Removal of sidewalk on East side
of Baldwin and Kersting Court
-Forming
for concrete curb & sidewalk.
-Installation
of storm drain pipe & catch basin Baldwin Ave.
at Highland Ave.
-Installation
of catch basins on
Sierra Madre Blvd.
-Boring
of conduit for electrical services
-Installation
of irrigation lines on Baldwin Ave.
THE SIDEWALK ON KERSTING COURT WILL BE REMOVED MONDAY
AND POURED BACK MONDAY NIGHT STARTING AT 10:00 PM.
SIDEWALK ON THE NORTH SIDE OF SIERRA MADRE BETWEEN CITY
HALL AND HERMOSA WILL BE CLOSED MONDAY FOR INSTALLATION OF CATCH BASIN.
Limits
of Work:
Baldwin Ave. from Sierra Madre Bl.
to Highland
Kersting
Court
Sierra
Madre BI. from Hermosa to Auburn
Contractor:
E.C. Construction Co.
Received 8/19/02
City
of Sierra Madre Downtown Improvement
Project
NOTICE
OF WORK TO BE DONE, Aug. 19 - 23
Date
of Work per this Notice:
Estimated
Duration:
5 working days
Type
of Work:
-Removal of sidewalk on East side
of Baldwin and Kersting Court
-Forming
for concrete curb & sidewalk.
-Installation
of storm drain pipe & catch basin Baldwin Ave.
at Highland Ave.
-Installation
of catch basins on
Sierra Madre Blvd.
-Boring
of conduit for electrical services
-Installation
of irrigation lines on Baldwin Ave.
Limits
of Work:
Baldwin Ave. from Sierra Madre Bl.
to Highland
Kersting
Court
Sierra
Madre BI. from Hermosa to Auburn
Contractor:
E.C. Construction Co.
Contact
Phone No:
626-836-6636 project
office
John
Gavigan, E.C. Construction
Project
Superintendent
Sincerely,
John
W. Gavigan
E.C.
Construction Co.
Received
8/9/02
City
of Sierra Madre Downtown Improvement
Project
NOTICE
OF WORK TO BE DONE, Aug. 12 - Aug.
16
Date
of Work per this Notice:
Estimated
Duration:
5 working days
Type
of Work:
-Removal of sidewalk on East side
of Baldwin and Kersting Court
-Forming
for concrete curb & sidewalk.
-Installation
of storm drain pipe & catch basin Baldwin Ave.
at Highland Ave.
-Installation
of catch basins on
Sierra Madre Blvd.
-Boring
of conduit for electrical services
-Installation
of irrigation lines on Baldwin Ave.
Limits
of Work:
Baldwin Ave. from Sierra Madre Bl.
to Highland
Kersting
Court
Sierra
Madre BI. from Hermosa to Auburn
Contractor:
E.C. Construction Co.
Contact
Phone No:
626-836-6636 project
office
John
Gavigan, E.C. Construction
Project
Superintendent
Sincerely,
John
W. Gavigan
E.C.
Construction Co.
Received
8/7/02
City
of Sierra Madre Downtown Improvement
Project
NOTICE
OF WORK TO BE DONE, JULY 28 - AUG. 2
Date
of Work per this Notice:
Estimated
Duration:
5 working days
Type
of Work:
-Forming of concrete curbs &
sidewalks.
-Installation
of storm drain pipe & catch basins
on Baldwin Ave.
-Installation
of 30 storm drain mainline pipe on
Sierra Madre Blvd. (work to be done
at night)
Limits
of Work:
Baldwin Ave. from Sierra Madre Bl.
to Highland
Kersting
Court
Sierra
Madre BI. from Hermosa to Auburn
Contractor:
E.C. Construction Co.
Contact
Phone No:
626-836-6636 project
office
John
Gavigan, E.C. Construction
Project
Superintendent
Starting
Sunday July 28 at 7:00 pm we will begin
the installation of the
storm
drain mainline. This work will be on
Sierra Madre Blvd. between
Hermosa
and Auburn. The work will take place at
night to minimize the
impact
to the local businesses. Our night hours
will be from 7 pm. 5 am.
Sincerely,
John
W. Gavigan
E.C.
Construction Co.
Received
7/29/02
City
of Sierra Madre Downtown Improvement
Project
NOTICE
OF WORK TO BE DONE, JULY 28 - AUG. 2
Date
of Work per this Notice:
Estimated
Duration:
5 working days
Type
of Work:
-Forming of concrete curbs &
sidewalks.
-Installation
of storm drain pipe & catch basins
on Baldwin Ave.
-Installation
of 30 storm drain mainline pipe on
Sierra Madre Blvd. (work to be done
at night)
Limits
of Work:
Baldwin Ave. from Sierra Madre Bl.
to Highland
Kersting
Court
Sierra
Madre BI. from Hermosa to Auburn
Contractor:
E.C. Construction Co.
Contact
Phone No:
626-836-6636 project
office
John
Gavigan, E.C. Construction
Project
Superintendent
Starting
Sunday July 28 at 7:00 pm we will begin
the installation of the
storm
drain mainline. This work will be on
Sierra Madre Blvd. between
Hermosa
and Auburn. The work will take place at
night to minimize the
impact
to the local businesses. Our night hours
will be from 7 pm. 5 am.
Sincerely,
John
W. Gavigan
E.C.
Construction Co.
|