Press Release posted 12/30/12 – The City of Arcadia is planning to repave and reconstruct Baldwin Avenue between Foothill Blvd. and Orange Grove Ave. The construction is scheduled for the month of February 2013. The work will include constructing new handicapped ramps, replacing damaged curb and gutter, repairing portions of deteriorated asphalt pavement and grinding and resurfacing the entire asphalt pavement surface. The street will remain open to through traffic at all times, but will require partial street closures. At least one travel lane in each direction will be open at all times. Expect travel delays through the area during construction. For more information or questions regarding the project, please contact Tim Kelleher of the City of Arcadia at (626) 574-5484 ortkelleher@ci.arcadia.ca.us.